For a firm of 5 to 50 people, a Microsoft 365 migration is mostly a tidy-up project with a carefully planned switchover at the end. Email moves to Microsoft’s servers, files move from the office server into SharePoint and OneDrive, and everyone signs in with one account.
The moving itself is rarely the hard part. Microsoft’s own SharePoint Migration Tool is free and handles file shares. The hard part is deciding what should move, who should be able to see it, and making sure nothing the firm relies on stops working on Monday morning.
What actually moves in a Microsoft 365 migration?
- Email, calendars and contacts, from your current mail system into Microsoft 365.
- Files, from the office server or shared drives into SharePoint (shared firm and client files) and OneDrive (each person’s own working files).
- Accounts, so each person has one sign-in for email, files and Teams, protected with multi-factor sign-in.
- Devices, so laptops are managed and kept up to date wherever staff work.
- Everything else that sends email or uses the server: scanners, practice software, shared mailboxes and old scripts nobody remembers.
That last group is where surprises come from. A scanner that emails documents to staff, for example, may need reconfiguring. Our post on scanners and Microsoft’s sign-in changes shows why.
What should you decide before anything moves?
These are firm decisions, not IT ones, and they are much easier to make before the move than after it:
- What to leave behind. Old archives and duplicates do not need to move to the new system. Decide what is kept, archived or deleted, in line with how long you need to keep client records.
- How files should be organised. Map folders to how the firm actually works: by client, by matter or project, by department. Our guide on where client files should live covers the choice.
- Who can see what. A migration is the cleanest chance you will get to fix permissions. Copying old permissions across unchanged carries old problems into the new system.
- Your sector software. Practice management, accounts and design software such as CCH, Sage or Revit may still need a server, a hosted option or its own migration. Check with the software supplier early.
How does the switchover run?
A well-run move for a small firm usually follows the same order:
- Inventory. List every mailbox, shared folder, device and system that touches email or files. The SharePoint Migration Tool includes a scan and assess step, so you can check what is there before anything moves.
- Clean up and agree the new structure. The decisions above.
- Pilot. Move a few people first and fix what they find.
- Move files in passes. Copy the bulk early, then copy only what changed just before the switchover.
- Switch over out of hours. Plan it so staff are not interrupted during working time.
- Day-one support. Someone on hand on the first morning to sort sign-in and phone set-up.
- Retire the old system only after checking. Keep the old server and its backups until you are sure everything arrived.
What happens to your data once it is in Microsoft 365?
It is still your responsibility. Microsoft runs the service, but deciding who has access, how long things are kept and whether there is a backup stays with the firm. Our post on whether Microsoft 365 backs up your data covers what is and is not protected by default.
It also helps to know the exit terms. If a paid subscription ends, Microsoft says it keeps the data in a limited-function account for 90 days so the firm can extract it, and then deletes it.
What usually goes wrong in a migration?
Most avoidable problems come from what wasn’t checked beforehand. The one most often missed is forgotten data: files on a desktop, an old external drive or a departed colleague’s laptop that never made it onto the list. The inventory step above exists to catch it, and the old system should stay available until the firm has confirmed nothing is missing.
If you’re still deciding whether to move at all, see Should you replace your server or move to Microsoft 365?
Where does this fit with managed IT?
A migration is the start, not the finish. The settings, permissions and devices set up during the move need looking after every week afterwards, or they drift back to where you started. At INNOSEC, Microsoft 365 is included in our managed IT service, with security, identity and devices set up properly, plus day-to-day help when your team needs it. See our managed IT page for how that works.
If you are weighing up a move, the IT Risk and Ownership Review looks at who owns your IT, where the risks are and what to fix first, which is the right starting point for planning it.
The technical move is only half of it; our guide to getting staff to actually use Microsoft 365 properly covers the rest.
Frequently asked questions
How long does a Microsoft 365 migration take?
It depends mostly on how much data you have and how much tidying it needs. The switchover itself is short and can be planned out of hours. The preparation takes longer.
Will we lose any email or files?
The safeguards are to plan the move in passes, check and back everything up first, and keep the old system until everything is confirmed. Skipping those checks is where losses happen.
Do staff need training after the move?
A short walkthrough of where files now live, how to share them safely and how multi-factor sign-in works covers most of it. The pilot group can help colleagues in the first week.